AER Reporting

Company Specific Reports & PAS File Creation

AER Reporting & PAS File Creation

GRD & TRG PAS File Creation

  • ERCB TRG & GRD PAS files are provided with all reports complete with validation receipt.
  • Electronic Report (PDF) Zipped with PAS Files, ASCII Files and validations are e-mailed to your customer.
  • Secured backup service of all reports provided for all customers.

AER Reporting

  • 24 to 48 Hour turn around in most cases
  • Branded Reports are created for each customer with their own colors, logos and preferences providing a unique design that distinguishes the report from all other generic reporting software.

Report Requests

  • We do not have any extra costs in regards to report requests, emailing, or any other information from your customers.
  • Before any report requests or information is given out via email we do require validation of request from the oil company

To send in report data and well schematics, attach your gauge data files to our Reporting Data form.

You can see one of our sample reports here

Data Reporting

Report TypeDescriptionPricing
Extended Reports (Tandem Set)Electronic PDF Copy Emailed To Customer$200.00
Gradient Reports (Tandem Set)AER Validation TRG PAS & ASCII Files E-Mailed To Customer$100.00
Gradient Report (As Part of an Extended Test)Electronic PDF Copy Emailed To Customer$75.00
Deviated Well (TVD Calculations)Additional$35.00
AER PAS File SubmissionAER Validation TRG PAS & ASCII Files E-Mailed To Customer$35.00/File
After Hours ProcessingAdditional$75.00/Hr
AER PAS files

Frequently Asked Questions

What are the AER stability requirements for a GRD.pas file?

The AER requires that the Electronic Recorders used during the .GRD test must be left On Bottom for a minimum of 2 hours and the pressure must not exceed +/- 2.5 kPa per hour. If the well has been shut-in for longer than 14 days then a 10 to 15 min On Bottom stop is acceptable and it is not required to meet the pressure stability requirements to pass as an "Initial Test".

What are the AER stability requirements for a TRG.pas file?

The AER requires that the Electronic Recorders used during the .TRG test must be left On Bottom for a minimum of 6 hours and the pressure must not exceed +/- 2.5 kPa per hour to pass as an "Initial Test".

Give us a call(403) 309-0980
Send us a messageContact form
Request a Quote
Call Request a Quote